High grid draw expected at 19:00
criticalBattery reserve will not cover the full evening peak at current dispatch. Projected grid import: 6.4 kW for 38 min.
Optimizer · forecast model · 12 min ago
Anomalies and operational events detected by the optimizer and the site gateway. Critical items affect today's savings or asset health.
Battery reserve will not cover the full evening peak at current dispatch. Projected grid import: 6.4 kW for 38 min.
String 2 has produced 18% less than the modelled output for 5 consecutive days. Possible soiling or shading.
Reserve dropped to 17% during last night's discharge — below the 20% floor. Likely cause: oven preheat at 04:50.
Tomorrow's peak window (18:00–21:00) is 22% above the 30-day average. The optimizer has rebalanced the dispatch plan.